We purchased our first home in Baltimore, MD, within the neighbor of Remington during May 2005. It was a cute 2 story, with full basement, 2BR 1B, and enclosed front porch. This blog documents our work on the house and life during that time. A project we will never forget :)

Monday, October 17, 2005

Progress !!!

Pictures to come...

This past weekend we installed two new windows in the front bedroom, built the front wall in the bedroom, cut three holes in the roofs to vent bathroom duct/pipes and downstairs kitchen/half bath pipes, and sealed all the holes back. Gregg Scharstein came over to help on Saturday.

Finishing work on the windows went better than I had hoped. All the joints are caulked, and all the wood primed for paint.

We found some new leaks in the roof after our 3 day monsoon.. good timing I guess, before we put up drywall !... So we think we are going to have the whole roof resurfaced.. We are going gather names of roofers from people, and get quotes from three different sources.

We are on schedule to move into the front bedroom before it gets... brr.. cold !

0 Comments:

Post a Comment

<< Home